CASE STUDY
背景画像
Home  > Case Study  > D City (JICA project)
Livestock feces and urine 2022.11.14

D City (JICA project)

アイキャッチ画像

1. Treated objects: municipal solid waste and landfilled waste

2. Treating capacity: 2 tons/day

3. Treating device: 1 type

4. Results: fuel, fertilizer

5. Place of introduction: D City, Bali, Indonesia

6. Introduced time: December 2017

Treating device

Treated object: MSW
Results: Plastic (photo above)
Results: Organic matter (photo below)
Biomass boiler (photo above)
Results Burning (Photo Below)